Cargo Road, Orange
Installation of stormwater drainage - approx 1.3km, and associated earthworks.
Construction of Detention Basin – William Maker Drive Orange
Construction of Detention Basin, bulk earthworks, including relocation of sewer, construction of stormwater drainage, concrete footpaths, hydroseeding/mulching.
Reconstruction of Proctor Park Bathurst
Installation of stormwater drainage structures – approximately 1700 mtrs and associated general earthworks.
Blayney Shire Council bridges replacement project
Associated earthworks for recontruction of bridges within Blayney Shire Council. Bridge road approaches, installation of steel concrete beams, concrete tilt panels and installation of rock gabion for erosion control.
Guanna Hill Mitchell Highway realignment stormwater installation
Installation of stormwater drainage - approx 2.4km, culvert backfill and general earthworks to RMS specifications.
Central Tablelands Water - Grenfell to Gooloogong Pipeline
Installation of potable water pipeline - approx 13km, including backfill and importation of bedding and backfill materials.
Redmond Oval Millthorpe, Carpark and road construction
Road and carpark construction works. Works included stripping of top soil, removal of wet areas, and construction of drainage structures and importation of new material to final survey levels.
Central Tablelands Water - Blayney Filtration Plant
Construction of office site pad for new offices, de-silting of waste water dams and drainage construction.
Redmond Oval Reconstruction, Millthorpe
Removal of the old cricket wicket, stripping and stockpiling of topsoil, bulk excavation - 20,000m3 of subgrade and installation of stormwater drainage structures, surface compaction and re-levelling of stockpiled topsoil.
Blayney Shire Council - Errowanbang Road Upgrade
Supply of 10,000m3 of road base materials. Works also included the hire of tipper trucks and water trucks.